Rewarding to read
Clear structure, expressive typography and precise information design for readers who need to understand, cite and come back to the work.

Reportory designs substantial publications for research organisations, consultancies and institutions: rewarding for people to read, semantically structured for accessibility, and easier for software to search, extract and retrieve.




Every substantial publication now has two readers.
We design for both.
Clear structure, expressive typography and precise information design for readers who need to understand, cite and come back to the work.
Semantic structure, a defined reading order and accessibility-aware production, so screen readers, search indexes and AI tools can find, extract and retrieve what the page says. Tested, not assumed.
See the test ↗For think tanks, research institutes, consultancies, design studios and institutions whose reports are recurring, strategic outputs, not one-off brochures.
View project ↗01
View project ↗02
View project ↗03
View project ↗04
View project ↗05
View project ↗06
View project ↗07
View project ↗08
View project ↗09
View project ↗10For research institutes, engineering and environmental consultancies, and institutions with something substantial to publish.
Studies an institution puts its name to: research programmes, industry outlooks, and benchmark assessments, with a clear argument and room for the evidence.
Research reports · Benchmark studies · Industry outlooksTechnical and scientific material — methods, measurements, drawings, appendices — organised so a specialist can verify it and a decision-maker can act on it.
Engineering studies · Technical reports · Standards & guidanceDocuments with a statutory reader and a public one at the same time: baseline, impact, mitigation, and monitoring, each traceable to its source.
Impact assessments · Baseline studies · Monitoring reportsAnniversary books and commemorative volumes: archive material, oral history, and photography built into a publication meant to last decades.
Anniversary books · Corporate histories · MonographsThe substantial document that closes an engagement. Produced in your design system or ours, credited or white-label.
Consultancy studies · Audits · White-label productionWe establish the audience, scope, manuscript readiness, responsibilities, and delivery requirements.
We map the editorial architecture and develop the visual direction through representative sample pages.
We build the complete system of text, images, graphics, and navigation. Content questions go back to the authors.
We coordinate revisions and agreed checks, with content-owner approval and preparation of the final editions.
Print and screen editions, navigable PDFs, and organized source handover. Accessibility requirements, specialist checks, and print coordination are agreed at the start of each commission.
Reportory is the independent editorial design practice of Raphael Albinati.
The practice brings experience in research publications, technical and institutional documents, and substantial reporting to the design of complex, long-form work. Structure and visual character are developed together, with close attention to the material and the people who will use it.
For writers & consultancies ↗“Raphael transformed a highly technical 100+ page document into a beautifully designed report. He is especially talented at complex data visualisation, and developed a strong brand identity that fit our needs exactly. He was extremely helpful through every round of iteration and worked very efficiently. I recommend him without hesitation, as he truly delivered on our highly demanding project.”
Long-form publications that an organisation puts its name to: research and industry reports, technical and engineering studies, environmental and social impact assessments, sustainability reports, white papers, institutional plans and training workbooks. Recent work ranges from a 16-page consultancy white paper to a 354-page certification workbook.
It means the file carries its structure, not just its look: tagged headings, a defined reading order, real tables instead of pictures of tables, alternative text for figures, bookmarks and correct metadata. Screen readers, search indexes and AI tools then read the document in the order a person would, and quote it correctly.
Send the link to your latest publication. We review its structure, reading order and tables, then put ten factual questions about it to three AI tools and score the answers against the text. You get a two-page result at no charge, and we reply within two working days.
Most projects are priced per page, with a fixed quote for each edition based on page count, graphic complexity, review rounds and the editions required. Repeat editions inside an existing design system cost less than a first edition. For design studios, overflow production can also be booked by the day.
A 40-page report typically takes two to three weeks from final manuscript to print-ready files. Longer documents, more review rounds or several language editions extend that, and the schedule is fixed with the quote.
Print-ready files, a screen edition as a navigable, accessible tagged PDF, and organised InDesign source files. Accessibility requirements, specialist checks and print coordination are agreed at the start of each commission.
Yes. Reportory works white-label or credited for consultancies, research teams and design studios, on complete publications or as extra production capacity inside an existing design system. Client communication goes through you unless agreed otherwise.
Recent work includes a 165-page sustainability document structured on the ESRS, a benchmark assessment of 42 asset managers that charts their adoption of the TNFD, and reports aligned to the Sustainable Development Goals. The design makes the framework visible: disclosure codes, linked indexes and consistent tables.
Reportory is the independent editorial design practice of Raphael Albinati. It works in English and Portuguese with organisations in North America, Europe and the Middle East, including WWF, the American Society of Civil Engineers, the City of Dawson and Hofseth.
Send us the link to your most recent publication. We read it the way people and software do: structure, reading order, tables, and ten factual questions put to it in three AI tools, scored against the text. You get a two-page result, at no charge.